Wednesday, October 12, 2011

Hark! Is that the King Tide Approaching?

I've heard of a spring tide and a neap tide but never a king tide. Apparently one is on its way though and the Long Island Sound Study is crowd-sourcing its extent and with a good rationale:

As sea levels continue to rise due to climate change, this unusual flooding brought during the King Tide will become common as tides continue to rise and fall under an elevated sea level. Although not caused by sea level rise, the height of a King Tide gives us an idea of what the average high tide level will be in 20-30 years.

They want you to take pictures, before and at its height, and then email them in or put them on Facebook. It sounds like a good project. Here are the details.

(Gina says NO one will get the allusion in the title. Anyone?)

Labels:

Wednesday, August 17, 2011

Progress on the Sound

The huge effort to remove nitrogen from treated sewage before it enters Long Island Sound will be judged a success only if it results in a major improvement to water quality in the western half of the Sound.

That hasn’t quite happened. My reading of the data collected by the Connecticut Department of Energy and Environmental Protection is that there has been some improvement but it’s not dramatic. Yet.


But if you believe that the people overseeing the cleanup are right that removing nitrogen from treated sewage will eventually lead to better water quality, then you have to also believe that things are going well, because the progress in nitrogen removal, in my opinion, has been good.

I’m basing this judgment on numbers I saw in the most recent biennial report of the Long Island Sound Study, which was released last week.

Remember that the original goal, set, if I remember correctly, in 1998, was to remove 58.5 percent of all the nitrogen that enters the Sound from sewage plants, by 2014 (that deadline has been changed to 2017 because of engineering problems in New York City and Westchester that have to do, as I understand it, with the size of the plants [NYC] and the fact that there is little room to expand the plants [Westchester]).

The biennial report says that we are 70 percent of the way to the 58.5 percent goal, an improvement of 18 percentage points since 2009. Here’s a quote from the report:

Since the early 1990s, when baseline discharges were calculated at 59,147 pounds per day, a total of 25,444 equalized pounds per day have been reduced. The ultimate goal is to reduce point source nitrogen inputs to Long Island Sound by another 11,000 pounds. In 2010, the states reached 70% of the final reduction target compared to 52% in 2009.

And this:

Ten plants, 8 in CT and 2 in NY, completed final or phased upgrades in 2009 and 2010 at a cost of $339.83 million. … About 60% of the reduction was the result of an interim project completed at the Hunts Point plant in the Bronx.

And this...

In 2010, The Wards Island Plant plant in New York City reduced 3,006 equalized pounds per day from baseline years as part of a demonstration project that involved the use of methanol. The innovative method, available for large plants, is called the SHARON (Single Reactor System for High Ammonia Removal Over Nitrate) process.

The progress at Wards Island and Hunts Point is encouraging because those treatment plants and two others in the Bronx and Queens -- Tallmans Island and Bowery Bay -- are huge: they are responsible for about 700 million of the 1 billion gallons of treated sewage discharged into the Sound every day.

If New York City is succeeding in removing nitrogen, that is likely to be very good news for Long Island Sound.

Labels: ,

Wednesday, June 27, 2007

What the Long Island Sound Study Biennial Report Says and Does Not Say

The Long Island Sound Study’s biennial report on conditions in the Sound arrived in the mail the other day, at about the same time the Connecticut DEP’s summary and analysis of water quality in the Sound from last summer arrived.

I can summarize the DEP summary easily:

Hypoxia affected a larger area of the Sound last year than during the previous two summers, but it lasted for a shorter time than any summer since 2000. Here’s how Katie O’Brien-Clayton of the DEP put it:

In 2006, hypoxic conditions were estimated to have begun on 4 July and ended on 29 August, approximately 57 days. The peak event occurred in early August. The maximum area with bottom water DO less than 3.5 mg/L was 346 square miles. In 2006 the area less than 3.5 mg/L was larger than during the 2004 and 2005 seasons; however, the duration was the shortest since 2000.

She also included a bunch of graphs, from which I drew the following:

Over the last 16 years, the average number of square miles in which dissolved oxygen concentrations fell below 3.5 milligrams per liter was 188. Eight years were better than average, one was just about exactly average, and seven were worse than average. Three of those seven occurred in the last four years.

The average length of time that dissolved oxygen concentrations were below 3.5 milligrams per liter was 67 days. Eight of the last 16 years were worse than average, three were almost exactly average, and five were better than average. Five of the last six years were either worse than average or merely average.

Of course reaching an average of 188 square miles and 67 days is hardly the goal of the Long Island Sound cleanup.

Back in the mid 1990s, the folks working on the cleanup set a target for reducing nitrogen by 58.5 percent by 2014. When reached, that reduction would mean that the area in which dissolved oxygen fell below 3.5 would be reduced to 60 square miles, and the number of days in which dissolved oxygen fell below 3.5 would be reduced to three and a half.

Which brings me to what I consider an omission in the Long Island Sound Study’s biennial report: there’s no discussion at all about the actual condition of the Sound’s water. There’s a section about nitrogen reduction and a section about the amount of water quality monitoring done each year, but nowhere does it talk about whether the nitrogen reduction is resulting in an improvement in water quality. Why? Who knows. But maybe it's because the results are so inconclusive.

So there it is – in lieu of a discussion in the Long Island Sound Study’s biennial report of water quality conditions, you have my layman’s discussion of water quality conditions. Having said that, though, I should add that there’s lots of good stuff in the biennial report. Here, for example, is a long excerpt from an opening letter by Mark Tedesco, the director of the Long Island Sound Program:

What will it take to clean up Long Island Sound and restore the health of its natural resources? Simply put—creative partnerships and money. No major breakthroughs, just strategic investments of financial and human capital….

Our first challenge is to maintain, repair, and upgrade our wastewater and stormwater treatment infrastructure for existing development. Clean water does not come cheap….

The local need alone is in the billions of dollars. However, the benefits would also be enormous: more waters safe for swimming and recreation, more shellfish safe for human consumption, and healthier waters for aquatic life. The technical know-how exists. Funding is needed. …

Our second challenge is to ensure that new development is sustainable. New development simply cannot impose the same burden on the environment as past development if we expect a different environmental outcome for our streams and rivers, and for the Sound. We must develop and grow in ways that generate less polluted runoff, while protecting and restoring open space and natural habitats. The region has the human capital to accomplish this. The space to grow outward is quickly diminishing. We will need to grow up (literally and figuratively) and in. It is here where past and future investments in wastewater and transportation infrastructure can accommodate growth….

Not bad, considering that opening remarks or letters are usually a collection of platitudes. Give Mark credit for laying it on the line: we need to invest more money, and we need to stop sprawling all over the landscape and rebuild our cities (when I made the same point about how development should be concentrated in cities, in a talk to the Stamford Garden Club in April, the room erupted in a derisive guffaw).

Now here’s what the report says about nitrogen reduction:

The discharge of nitrogen from sewage treatment plants reached its peak in 1994. Since then, 39 of the region’s 104 sewage treatment plants have been upgraded to provide Biological Nutrient Removal (BNR) of nitrogen, resulting in about 40,645 fewer pounds of nitrogen per day. That’s enough nitrogen to fertilize 327,462 acres of turf for one year, an area nearly the size of the Bronx, Westchester County, and Stamford combined.

In 2005 and 2006, six nitrogen removal projects were completed at a cost of about $77 million. In addition, two interim plant upgrades were completed, and 13 other plants were undergoing construction. In spite of these actions, nitrogen loads increased by 6,000 pounds a day in 2005. New York City plants, which had been accomplishing moderate reductions of nitrogen, were “offline” during this period as a result of undergoing modernization. In addition, heavy rainstorms contributed to overcapacity problems in older plants that accept stormwater, diminishing the ability of these plants to treat nitrogen.

Both New York and Connecticut are implementing innovative programs to reduce nitrogen levels in phases by 2014. In Connecticut, communities that upgrade their plants receive nitrogen credits that are exchanged for cash through a state Nitrogen Credit Trading program. Communities that have delayed upgrades buy the credits at the exchange. The program takes into account that some plants can more cost-effectively remove nitrogen because of their size and design, or have a greater impact because of their proximity to the western Sound where hypoxia is more severe. New York’s plants are divided into five management zones. As long as each zone meets an aggregate nitrogen reduction target, all plants are in compliance. Every five years, the permitted aggregate nitrogen target is reduced for the zone, requiring more plant upgrades to go on-line.

Again, good stuff. The nitrogen reduction program seems to be moving along just fine, the increase in recent years is easily attributable to New York City (and probably understandable), and (based on what it says elsewhere in the report) the city is making progress on its own relaxed-schedule nitrogen removal program (that’s my phrase, based on the fact that the city agreed to meet its nitrogen reduction goal in 2017, three years after everyone else.

Here’s the link to the biennial report.

Labels:

eXTReMe Tracker